The ILSCO SK-750 CU is a copper split-bolt clamp connector for two stranded conductors, with listed compatibility for copper-to-copper, Copperweld-to-Copperweld, and copper-to-Copperweld combinations.
0.563–0.999 in Wire Diameter
Two-Conductor Split-Bolt Clamp
Copper/Copperweld Compatibility
Copper Alloy and Tin-Plated Hardware
35 kV, 90°C and UL-Listed
1,000 in-lb Installation Torque
The ILSCO SK-750 CU is a copper split-bolt clamp connector for two stranded conductors, with listed compatibility for copper-to-copper, Copperweld-to-Copperweld, and copper-to-Copperweld combinations.
The ILSCO SK-750 CU is a copper split-bolt clamp connector for two stranded conductors, with listed compatibility for copper-to-copper, Copperweld-to-Copperweld, and copper-to-Copperweld combinations.
0.563–0.999 in Wire Diameter
Two-Conductor Split-Bolt Clamp
Copper/Copperweld Compatibility
Copper Alloy and Tin-Plated Hardware
35 kV, 90°C and UL-Listed
1,000 in-lb Installation Torque
Technical Specifications
Product information and specifications for the selected item.
SKU: SK-750 CU
Product Information
Brand
ILSCO
MPN
SK-750 CU
SKU
SK-750 CU
Category
Terminals, Splices & Connectors
Key Specs
Wire Connector Type
Clamp
Minimum Wire Gauge
250
Color Family
Copper
Length (in.)
3.75
Connector & Wire
Wire Connector Type
Clamp
Minimum Wire Gauge
250
Minimum tap with one maximum-size main
2/0 STR
Spacer placement for SK models
Keep the additional spacer clamped between the wires, with its radius side facing the nut/pressure bar.
Torque warning
Failure to achieve proper torque will cause connector and wire overheating.
Splice connection procedure
Insert splice wires from opposite sides to full clamp contact; hand-tighten the nut, then torque to the chart value.
Temperature rating
90 °C
Direct burial
No
Wire diameter range
.563-.999 in
Compatible conductor combinations
Copper-to-copper, copperweld-to-copperweld, and copper-to-copperweld
UL listing
UL-listed wire connector, 460C
Recommended torque
1000 in-lb
Main drive size
2-1/8
Material
High-strength copper alloy
Installation torque
1000 in-lb
Main drive type
External hex
Dual rated
No
Tap connection procedure
For a tap connection, remove the nut/pressure bar and spacer, position the connector over the main wire, reinstall the spacer and nut/pressure bar, then insert the tap wire to full clamp contact and torque as specified.
Conductor preparation
Clean conductor surfaces with a wire brush or abrasive cloth; apply anti-oxidant to stripped ends with a wire brush, working it into the strands.